Canadian Arctic ACE/OSIRIS Validation Campaign
Instrument Status Summary
Current Status: 18 March 2015
Bruker 125HR FTS: Nominal operation
PARIS-IR FTS: Nominal operation
UT-GBS: Nominal operation
PEARL-GBS: Nominal operation
SAOZ: Nominal operation
SPS-G: Nominal operation
MAESTRO-G: Not on this campaign
DIAL LIDAR: Not operating
Brewer #111: Nominal operation
E-AERI: to be re-installed during extended phase of campaign
Ozonesonde: ACE ozonesonde flights have concluded.